Building Safety Checklist For Fire Safety


Factory Name-  

Group Name-  

Factory Building size(details)-  

How many floors ?  

Factory License No#   Building approval plan Completed(year)  

Establishments of factory(year)  

Total Employee-  







Building Fire Safety
S/N  Broad Issue  Specific point  Relation with Fire Safety Information Remarks
1 Building Height Height based on front road and setback Evacuation and safe exit will be affected if appropriate space is not available for a particular height of the building    
2 Total Floor Area Maximum permissible FAR Construction type versus vertical extension, affects fire & evacuation.    
3 Open space Total open space (%) Fire separation distance    
Rear open space Fire separation distance    
Left & Right side Fire separation distance    
Maximum use of open space Fire separation distance    
4 Overhead Electric Lines Vertical Clearance Accidental contact and arching    
Horizontal Clearance Accidental contact and arching    
5 Emergency exit/ means of escape Number and width of exits Safe Evacuation    
Location of exits remote from each other Safe Evacuation    
Number of Staircases Safe Evacuation    
Width of staircase Safe Evacuation    
Width of corridors and ramp Safe Evacuation    
Width of aisles Safe Evacuation    
Width of doors Safe Evacuation    
Exit doors locked Safe Evacuation    
Auto closer at all doors Prevention from smoke    
Travel path/Length of travel Safe Evacuation    
Travel distance Safe Evacuation    
Exit route fully or partially blocked Safe Evacuation    
Assembly Point Safe Evacuation    
Barred windows, release mechanism & escape Safe Evacuation    
       
6 Handrail Handrail requirement Evacuation and rescue    
7 Ceiling height   Overcrowding, fire spread    
8 Overcrowding   Evacuation and panic management    
9 Exit doors Type of door (outward openeing, side swinging,push-bar operated) Safe evacuation    
Fire resistant Safe evacuation    
10 Hazardous materials Amount of storage Fire load and spread    
Distance between stacks & distance from stack to other building elements ( Ceiling,Walls etc) Fire load and spread    
11 Reserved water for firefighting   Fire fight    
12 Area per Extinguisher   Fire fight    
13 Hose System Diameter of Hose Fire fight    
Length of Hose Fire fight    
Maximum pressure Fire fight    
Number & location Fire fight    
14 Area per Detector   Fire detection    
15 Roof top Uncovered Area Type of construction, use of space & evacuation.    
16 Fire Lift Lift Capacity Fire fight by fire brigade    
17 Emergency lights Adequacy and spread Safe Evacuation    
18 Fire Alarm & PA System Centralized, addressable Fire detection, communication, panic management    
19 Fire Command Station Location, person in charge, documents & materials,use. Co-ordination of evacuation, fight & rescue.    
20 Sign Floor number Safe evacuation    
Use of stair in case of fire Safe evacuation    
Direction of exit Safe evacuation    
Evacuation plan Safe evacuation, rescue.    
21 Smoke proof enclosure For stairs For safe evacuation    
22 Fire vehicle Vehicle manoeuver space Firefighting    
23 Child Care Safe location Safety of children    
24 Conversion of building Conversion from residential to industrial is not allowed. Fire risk mitigation    
25 Commercial space Not allowed in any floor Fire risk mitigation    