Factory Name- | |||||
Group Name- | |||||
Factory Building size(details)- | |||||
How many floors ? | |||||
Factory License No# | Building approval plan Completed(year) | ||||
Establishments of factory(year) | |||||
Total Employee- | |||||
Building Fire Safety | |||||
S/N | Broad Issue | Specific point | Relation with Fire Safety | Information | Remarks |
1 | Building Height | Height based on front road and setback | Evacuation and safe exit will be affected if appropriate space is not available for a particular height of the building | ||
2 | Total Floor Area | Maximum permissible FAR | Construction type versus vertical extension, affects fire & evacuation. | ||
3 | Open space | Total open space (%) | Fire separation distance | ||
Rear open space | Fire separation distance | ||||
Left & Right side | Fire separation distance | ||||
Maximum use of open space | Fire separation distance | ||||
4 | Overhead Electric Lines | Vertical Clearance | Accidental contact and arching | ||
Horizontal Clearance | Accidental contact and arching | ||||
5 | Emergency exit/ means of escape | Number and width of exits | Safe Evacuation | ||
Location of exits remote from each other | Safe Evacuation | ||||
Number of Staircases | Safe Evacuation | ||||
Width of staircase | Safe Evacuation | ||||
Width of corridors and ramp | Safe Evacuation | ||||
Width of aisles | Safe Evacuation | ||||
Width of doors | Safe Evacuation | ||||
Exit doors locked | Safe Evacuation | ||||
Auto closer at all doors | Prevention from smoke | ||||
Travel path/Length of travel | Safe Evacuation | ||||
Travel distance | Safe Evacuation | ||||
Exit route fully or partially blocked | Safe Evacuation | ||||
Assembly Point | Safe Evacuation | ||||
Barred windows, release mechanism & escape | Safe Evacuation | ||||
6 | Handrail | Handrail requirement | Evacuation and rescue | ||
7 | Ceiling height | Overcrowding, fire spread | |||
8 | Overcrowding | Evacuation and panic management | |||
9 | Exit doors | Type of door (outward openeing, side swinging,push-bar operated) | Safe evacuation | ||
Fire resistant | Safe evacuation | ||||
10 | Hazardous materials | Amount of storage | Fire load and spread | ||
Distance between stacks & distance from stack to other building elements ( Ceiling,Walls etc) | Fire load and spread | ||||
11 | Reserved water for firefighting | Fire fight | |||
12 | Area per Extinguisher | Fire fight | |||
13 | Hose System | Diameter of Hose | Fire fight | ||
Length of Hose | Fire fight | ||||
Maximum pressure | Fire fight | ||||
Number & location | Fire fight | ||||
14 | Area per Detector | Fire detection | |||
15 | Roof top | Uncovered Area | Type of construction, use of space & evacuation. | ||
16 | Fire Lift | Lift Capacity | Fire fight by fire brigade | ||
17 | Emergency lights | Adequacy and spread | Safe Evacuation | ||
18 | Fire Alarm & PA System | Centralized, addressable | Fire detection, communication, panic management | ||
19 | Fire Command Station | Location, person in charge, documents & materials,use. | Co-ordination of evacuation, fight & rescue. | ||
20 | Sign | Floor number | Safe evacuation | ||
Use of stair in case of fire | Safe evacuation | ||||
Direction of exit | Safe evacuation | ||||
Evacuation plan | Safe evacuation, rescue. | ||||
21 | Smoke proof enclosure | For stairs | For safe evacuation | ||
22 | Fire vehicle | Vehicle manoeuver space | Firefighting | ||
23 | Child Care | Safe location | Safety of children | ||
24 | Conversion of building | Conversion from residential to industrial is not allowed. | Fire risk mitigation | ||
25 | Commercial space | Not allowed in any floor | Fire risk mitigation |
Compliance is the key to garments sector.Without compliance RMG sector will not be sustainable in Bangladesh.So we are trying to post some compliance document and latest requirement in this blog.